Prestressed Triple Walkway Bridge

STRONG Bridge!
STRONG Bridge!

For information, contact: Albert Crowsky, 847-809-4593

Sound engineering, deliberations, and a dose of creative improvisation entered into the picture during the building process.
Sound engineering, deliberations, and a dose of creative improvisation entered into the picture during the building process.
The finished bridge is decorated with pennants.
The finished bridge is decorated with pennants.

JAMBOREE PIONEERING AREA: BRIDGES

JAMBOREE PIONEERING AREA: MAIN PAGE

Author: Scout Pioneering

Volunteer in the Boy Scouts of America

2 thoughts on “Prestressed Triple Walkway Bridge”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: