14′ Gateway Tower (4 Flag Tower)

Coker Four Flags
Gateway to the Boy Scout Camp Pioneering Area

Using the 14′ Double Ladder Signal Tower as a point of reference, here are the plans for a very tall campsite gateway that stands out (and up) and serves as an impressive feat of Scout engineering. One of the perks included in this project is it provides an opportunity for new Scouts to experience hoisting a “boy-sized” structure replete with their own special colors e.g. their patrol flags.

Since this 14-foot structure isn’t climbed on, the spars can be considerably thinner in diameter. Bamboo is ideal. Lashing on those flags attached to each corner creates a spectacular effect and hence the name “4 Flag Tower!”

14′ Tower Gateway Schematic / Gateway to a Scout Expo Photo

Note: This design is not self-standing. Therefore, using it as a gateway at a camporee or Scout Expo with the necessary guylines requires an area wide and deep enough to accommodate a 16 x 16-foot space.

Scouts lash together a 4' Side.
Scouts lash together a 4′ Side.

Materials Needed:

  • four 2-1/2 to 3-inch x 14-foot leg spars
  • six 2-inch x 8-foot X-brace spars
  • four 2-inch x 6-foot X-brace spars
  • four 2-inch x 6-foot support spars
  • six 2-inch x 4-foot leg spreader
  • forty-five 15-foot x 1/4-inch lashing ropes
  • four 25-foot guylines
  • eight 24-inch pioneering stakes

Assemble the 4-foot sides. Begin by laying out two pairs of 14-foot spars for the tower legs, side by side, 3 and 1/2 feet apart. Be sure the butt ends are even at the bottom so the tower will stand up straight.

NOTE: All lashings need to be very tight.

Diagram 1
Diagram 1

Lash the legs together starting with a 4-foot bottom leg spreader about 6 inches up from the butt ends. Lash on a 4-foot middle leg spreader in the middle of the 14-foot legs (7 feet up), and a 4-foot top spreader about 3 inches from the top of the 14-foot legs.

When the legs are joined with the three 4-foot spreaders, lash on two 6-foot X-brace spars using square lashings to lash the ends to the legs, and a diagonal lashing where they cross, forming a trestle in the bottom half of the legs (see diagram 1). Three of the ends are lashed to the outside of the legs, and one on the inside, so that a slight gap is created where they cross. As the diagonal lashing begins, this gap will be cinched together with the timber hitch. Repeat the whole process with the other two 14-foot legs.

Diagram 2
Diagram 2

Join the 4-foot sides. Turn both sides up horizontally, parallel to one another about 5 and 1/2 feet apart. Make sure the bottoms are even.

Lash on one of the 6-foot support spars directly above the 4-foot middle spreader (see diagram 2).

Lash another one of the 6-foot support spars directly under the 4-foot side spreader at the very top.

Lashing the X Braces with a Diagonal Lashing.
Lashing the X Braces with a Diagonal Lashing.

Now, lash on two of the 8-foot X brace spars diagonally between the two 6-foot supports using square lashings to lash the ends to the legs, and a diagonal lashing where they cross forming a trestle in the top part of the wide (6-foot) side (see diagram 2). Three of the ends are lashed to the outside of the legs, and one on the inside, so that a slight gap is created where they cross. As the diagonal lashing begins, this gap will be sprung together with the timber hitch.

Lash the other side. To make the lashings on the other side, you have to get the whole crew together to carefully lift and roll the tower over 180° so that it’s laying on the X-brace, and the other sides of the 4-foot sides are easier to get to.

Repeat the same procedure as before.

Scouts carefully lift the structure and rotatie it 180° to lash the other side.
Scouts carefully lift the structure and rotatie it 180° to lash the other side.

Lash on the middle X-brace.  This X-brace is what will keep the four sides from racking. Lash the two remaining 8-foot X brace spars diagonally across the legs just under the 4-foot middle leg spreader (see Tower Gateway Schematic on the top of this page). Use square lashings to lash them to the legs and a diagonal lashing where they cross. To accomplish this, some crew members will have to hold up the top of the tower so that  there is better access to all four ends of the 8′ X brace spars.

Lash on the flags. If you want a flag or flags to fly from the top of the tower, lash the flagpole(s) to the top of each tower legs using a couple of tight round lashings.

Tower Gateway Layout
Tower Gateway Layout

Anchors and guylines. When all the lashings are done, move the tower to where it will be hoisted. Before actually hoisting the tower, lay out the position of the four legs on the ground.  Then determine where the four anchors for the guylines will be placed to steady the legs of the tower.

Using the pioneering stakes, build four 1-1 anchors. Each should extend 16 feet, 45° out from the leg.

Attach the four guylines to the legs about 12″ above the middle 4′ spreaders with a roundturn with two half hitches.

NOTE: Make sure the flags are unfurled before hoisting the tower.

Hoisting the tower. You’ll need a whole crew to do the hoisting. Get ready to hoist the tower by delegating the following:

  1. One signal caller who tells the crew members when and how fast to pull on the ropes.
  2. One safety officer who observes for all safety considerations and signs of trouble during the hoisting.
  3. Four Scouts to serve as “Lifters” to lift the top 6′ support spar that’s on the ground. Their job is to first left and then push the tower up.
  4. Two Scouts, one on each of the 2 guylines attached to the legs, to make sure the tower isn’t over pulled and topples over
  5. Four “Pullers” who will use the two guylines as hoisting ropes to pull the tower until it is standing
We did it!
We did it!

When everyone is in position, the signal caller should direct the Scouts on the hoisting ropes (the pullers) to hoist the tower into position, while the lifters start lifting. Care should be exercised not to over pull the tower.

As soon as the tower is standing, four Scouts should temporarily tie the guylines to the anchors using a roundturn with two half hitches.

Heeling the tower. If the tower is uneven, you can heel the the butt ends of the legs 4 to 6 inches deep as needed to make it more level.

Tighten the guylines. As soon as the tower is in position, go to each of the anchors and untie the Roundturn with Two Half Hitches and replace it with a rope tackle. Use the rope tackles to hold the tower steady, by gradually applying strain to each of the four guylines at the same time. Do this by tying a butterfly knot in each guyline about 6 to 8 feet from the anchor. Then wrap the running end of the guyline around the forward stake of the anchor and back through the loop in the butterfly knot. When rope tackles are tied to all four anchors, gradually tighten the lines. Apply enough strain to each of the guylines to hold the tower firm and in a vertical position. Then tie off the rope tackles and secure the running ends with half hitches.

Hoisting a Larger Version: 17' high x 8' wide x 6' deep
Hoisting a Larger Version: 17′ high x 8′ wide x 6′ deep

14′ Double Ladder Signal Tower

This signal tower went up on a camping trip in March of 2000 in a large grassy field. The operation took a little over two hours. PHASE 1: Before we started, a well-muscled sledge hammer crew, made up of Jason Hardee, Theodore Fontana, Cory Keibler, Kurt Lester, and Will Hall, took turns pounding in 24 three-foot pioneering stakes to make up the four “1-1-1” anchors needed to tie the tower down. PHASE 2: A crew assembled the 2 fourteen foot ladders. (All Scout campers tied at least one of the fifty square lashings required to put together the completed project.) PHASE 3: Another crew held the ladders in position while they were lashed together. Thanks to Jason for his diagonal lashings, and Theodore and Hiram for their help in lashing down the floor spars making up the platform. PHASE 4: The tower is hoisted with Scouts manning each corner guyline and the rope used to make sure the tower isn’t pulled too far before it’s secured. Thanks to Michael O’Neil who was in charge of tightening the guylines using the rope tackles at each of the anchors
This signal tower went up on a camping trip in March of 2000 in a large grassy field. The operation took a little over two hours. PHASE 1: Before we started, a well-muscled sledge hammer crew, made up of Jason Hardee, Theodore Fontana, Cory Keibler, Kurt Lester, and Will Hall, took turns pounding in 24 three-foot pioneering stakes to make up the four “3-2-1” anchors we thought we needed to tie the tower down. (For years, we overlooked the fact all we really needed were 1-1 anchors.) PHASE 2: A crew assembled the 2 fourteen foot ladders. (All Scout campers tied at least one of the fifty Square Lashings required to put together the completed project.) PHASE 3: Another crew held the ladders in position while they were lashed together. Thanks to Jason for his Diagonal Lashings, and Theodore and Hiram for their help in lashing down the floor spars making up the platform. PHASE 4: The tower is hoisted with Scouts manning each corner guyline and the rope used to make sure the tower isn’t pulled too far before it’s secured. Thanks to Michael O’Neil who was in charge of tightening the guylines using the rope tackles at each of the anchors

The National Camp Accreditation Program (NCAP)   Program Specific Standard PS-212 states: “Scout camp structures such as monkey bridges, obstacle courses, and pioneering towers are expected to meet safety standards in equipment and supervision comparable to COPE but are not subject to COPE standards, do not require COPE inspection, and do not require an on-site COPE Level II instructor.
“VERIFICATION: If a project has participants elevated more than 6 feet above the ground, evidence of council enterprise risk management approval. This approval may be part of the general program design review in Standard PD-112.” 

—> RECENT TOWER CONSTRUCTION <—

14′ Boy Scout Tower Gateway (Four Flag Tower)

Jamboree Pioneering Area: Towers

The following text is by Adolph E. Peschke as presented in the 1998 printing of the 1993 edition of the Pioneering Merit Badge Pamphlet:

This project solves the old problem of wanting to build a signal tower when there aren’t enough big spars to do the job. The double ladder tower requires four 14-foot spars and several smaller spars, but not nearly the amount needed for a four-leg signal tower. It also cuts down the number of lashings required.

This tower is not free standing. It requires the use of guylines to hold it steady. Review the sections on anchors and rope tackle if this is your first encounter with guylines.

Assemble the ladders. This project begins with building two ladders: a climbing ladder and a supporting ladder. Lay out two pairs of spars on the ground for the legs of the ladders. Be sure the butt ends are even at the bottom so that the tower will stand up straight. Before you begin any lashing, mark the positions where the spars that will hold the top platform are to be lashed onto the legs. This is about 4 feet from the top ends of the legs.

To make the climbing ladder, lash ten rungs on one pair of legs at about 1-foot intervals. The top rung should be lashed on where you marked the position of the platform, 4 feet from the top. Also the top handrail is lashed on to complete the climbing ladder.

To make the supporting ladder, lash three spars on the other set of legs to serve as the bottom, center, and top spreaders. The top spreader should be lashed at the point you marked for the platform, 4 feet from the top. Then lash on the top handrail, as on the climbing ladder.

Lash the ladders together. Now you have to join the two ladders to form the tower. Turn the two ladders up on their sides so they’re parallel to each other and approximately 6 feet apart. Check to see that the bottoms are even. Now lash on the base spreader to join the bottoms of the two ladders.

Lash on the platform supporting spar just above the top rung and top spreader on the ladders. Before proceeding, check the measurements from the bottoms of the legs to the platform supporting spar to make sure they’re equal on both legs so that the platform will be level.

Continue by lashing on the top long handrail. The lash on the two side X-braces diagonally between the legs using square lashings to lash the ends to the legs, and a diagonal lashing where they cross.

Figure 137
Figure 137

Lash the other side. To make the lashings on the other side, you have to get the whole crew together to roll the tower over 180° so that it’s laying on the X braces and the other sides of the ladders are up where they will be easier to get to.

Then proceed as before. Lash on the base spreader spar and the platform supporting spar. Again, measure to make sure there’s equal distance from both ends of the platform support spar to the bottoms of both legs. Continue to lash on the top long handrail and finish with the X-braces.

Lash on two more platform X-braces under the platform. These braces go diagonally across the legs just under the platform to help the tower resist racking (see figure 137). Use square lashings to lash them to the legs and a diagonal lashing where they cross.

14' Double Ladder Signal Tower Schematic
14′ Double Ladder Signal Tower Schematic

Before standing the tower upright, lash on the spars to form the platform floor.

Anchors and Guylines. When all the lashings are done, move the tower to where it will be hoisted. Before actually hoisting the tower, lay out the position of the four legs on the ground.  Then determine where the four anchors for the guylines will be placed to steady the legs of the tower. (Refer to the Anchors section to determine the position of the anchors.)

If the tower is positioned to make use of a natural anchor (such as a tree), prepare anchor strops to attach the guylines. For any guylines that won’t be using natural anchors, build anchors using pioneering stakes. At a minimum, you’ll need to build well constructed 1-1 anchors at all four corners.

Attach the four guylines to the legs just above the platform. The guylines should be 3/8-inch diameter manila or polypropylene rope. They’re attached to the legs of the tower using a roundturn with two half hitches and securing the running end of the rope.

Note: For safety reasons, never use a taut-line hitch on guylines, or for that matter, in any pioneering work. This hitch is used when adjustments in the tension are called for. It can slip.

During the Carwash Fundraiser in May of 1997, we raised our third 14 foot Double Ladder Signal Tower. After the tower is lashed together, requiring 50 square lashings, before it can be hoisted, it has to be carried and positioned in the exact location. Once in position, the crew divides into :lifters
Hoisting the 14′ Double Ladder Signal Tower

Hoisting the tower. Hoisting the tower up into a vertical position is done with separate ropes. Do not use the guylines. Tie two lines on the side of the tower being lifted and one line on the opposite side to prevent over pulling and toppling the tower.

You’ll need a whole crew to do the hoisting. First there should be a safety officer who observes for all safety considerations and signs of trouble during the hoisting. There should also be a signal caller who tells the crew members when and how fast to pull on the hoisting ropes and when to stop pulling. Two or more Scouts should be on each of the two ropes. And one or two Scouts should be on the rope on the other side to prevent over pulling the tower.

When everyone is in position, the signal caller should direct the Scouts on the hoisting ropes to hoist the tower into position. As soon as it’s up, temporarily tie the guylines to the anchors using a roundturn with two half hitches.

Heeling in the legs. When the tower is upright, heel in the butt ends of the tower legs in holes about 4 to 6 inches deep. This is done to steady the tower and can also help in leveling the tower to make sure that the platform is level and the tower itself is vertical.

Four 1-1 Anchors
Four 1-1 Anchors

Tighten the guylines. To hold the tower steady, gradually apply strain to each of the four guylines at the same time. One of the easiest ways to adjust the strain is to tie a rope tackle on the anchor ends of the guylines.

As soon as the tower is in position and the legs are heeled in, go to each of the anchors and untie the roundturns with two half hitches and replace it with a rope tackle.

Do this by tying a butterfly knot in each guyline about 6 to 8 feet from the anchor. Then wrap the running end of the guyline around the forward stake of the anchor and back through the loop in the butterfly knot. When rope tackles are tied to all four anchors, gradually tighten the lines. Apply enough strain to each of the guylines to hold the tower firm and in a vertical position. Then tie off the rope tackles and secure the running ends with half hitches.

Test the structure. Before the tower can be put into general use, make a test climb while the safety officer and the whole crew observe all the lashings and anchors to ensure they are all secure.

Note: Some people are not comfortable climbing up to a high place. They should not be encouraged to climb if they are not sure of themselves. Do not pressure anyone to climb the tower if they don’t want to.

1997 EXPO TOWER
1997 SCOUT EXPO TOWER

MATERIALS:

  • four 4-inch x 14-foot tower legs
  • ten 2-inch x 3-foot climbing ladder rungs
  • three 2-inch x 3-foot support ladder spreaders
  • two 2-1/2-inch x 6-foot base spreaders
  • two 2-1/2-inch x 6-foot platform supporting spars
  • two 2-inch x 3-foot platform handrails
  • two 2-inch x 6-foot platform long handrails
  • four 2-1/2-inch x 10-foot X braces
  • two 2-1/2-inch x 8-foot X braces
  • eighteen 2-inch x 3-1/2-foot platform support slats
  • eight pioneering stakes
  • binder twine
  • four 3/8-inch x 50-foot manila guylines
  • thirty-one 1/4-inch x 15-foot manila lashing ropes (for 28 square Lashings and 3 diagonal lashings)
  • twenty-two  1/4-inch x 20-foot manila lashing ropes (for 22 square lashings)

In accordance with current regulations, a fine adaptation consists of replacing the ladder rungs with support side spreaders, and dispensing with the platform floor slats. Lashing one or more long flag poles to the top of the legs and flying banners or flags never fails to elicit a rousing array of cheers, as the Scouts hoist their tower into an upright position!  Click here for project description and materials.