Rope-Toss-Log-Lift-Challenge at the Jamboree

Getting Ready For the Toss
Getting Ready For the Toss
Tying that Sheep Shank
Tying that Sheep Shank

Those visiting the Pioneering Area on Garden Ground Mountain had an opportunity to find out how well and how fast they could lift a log off the ground by coiling a rope and tossing it over a crossbar, tying a Timber Hitch around a log on the other side, tying a Clove Hitch around a stake in the ground, and finally lifting the log by tying a Sheepshank.

The Rope-Toss-Log-Lift Challenge is  a good test of rope-handling and some basic knot-tying skills, and it can be even more fun when competing on an individual basis or as a threesome.

Click HERE for further information and procedure.

Click the Image for complete instructions and guidelines.
Click the Image for complete instructions and guidelines.

PIONEERING AREA: ACTIVITY STATIONS & GAMES

JAMBOREE PIONEERING AREA: MAIN PAGE

The Misunderstood Clove Hitch

VIEW VIDEO: How to Tie and Apply the Clove Hitch and Half Hitches

Ah, the clove hitch. It’s a simple way to attach a rope to a pole, it’s side-to-side adjustable and is frequently used to start and finish a variety of lashings. Some folks don’t like it because in various applications, it’s not the most secure or reliable choice. But, in those instances, there are numerous alternatives. See the following photos—all close clove hitch relatives.

Clove Hitch / Rolling Hitch / Constrictor / Spar Hitch
Clove Hitch / Rolling Hitch / Constrictor / Spar Hitch

The clove hitch is one of the most-frequently-used knots Scouts learn, so common, yet it can also be very elusive, especially when it comes to completing certain lashings. In the knot-tying universe, the clove hitch is a whole lot more prevalent than most of us realize, and it can be tied in a variety of ways and from a variety of different perspectives.

Of course they're all clove hitches!
Of course they’re all Clove Hitches!

Two Half Hitches. Here’s what John Thurman says in Pioneering Projects: “The first and everlasting thing to remember about the clove hitch is that it is composed of two half hitches. What a very obvious thing to say, but there is hardly one Scout in a hundred who learns what it means. If only we can get Scouts to learn that if you make one half hitch and another half hitch and bring them together they make a clove hitch, what a lot of time the Movement would save in the amount of fiddling and fumbling that goes on when a clove hitch is the order of the day. We would be able to start in the sure knowledge that we can make clove hitches and pass quickly on to better and brighter things.”

Starting from the right and proceeding the the left. / Starting from the left and proceeding to the right.
Starting from the right and proceeding the the left. / Starting from the left and proceeding to the right.

Before addressing the various ways to approach tying a clove hitch, did you ever wonder why the basic knot, two half hitches is called “Two Half Hitches?” (The name “Double Half Hitch” has also been used.) What’s a half hitch anyway? Well, now we know it’s half a clove hitch, (the line wraps around the object and then passes under itself) but how many of us have realized that in actuality,  two half hitches is a clove hitch tied around the rope’s standing part? That’s what it is! On a side note, the very useful taut-line hitch is nothing but a clove hitch started off with a roundturn (called a rolling hitch), which is also tied around the rope’s standing part. As mentioned above, the clove hitch is whole lot more prevalent than most of us realize, and indeed it can be tied in a variety of ways. Here we go:

A Hitching Post with a Series of Half Hitches
A Hitching Post with a Series of Half Hitches
Hitching Race during the Troop Meeting Gathering Period
Hitching Race during a Troop Meeting’s Gathering Period

Open-End Clove Hitch (Clove Hitch on a Bight). Back in the 60s at Camp Wauwepex, a Scout camp on Long Island, one of the attractions in the Scoutcraft area was a vertical pole about 4 feet tall with a rope attached near the bottom. This was a “Hitching Post.” It was put up so Scouts could see how many Half Hitches they could throw over the top of the pole as quickly as possible. Watching fellow Scouts who had mastered the simple technique provided enough motivation to learn how to do it too, and it was easy to get quite good at it. As we were throwing hitches over the pole with greater and greater alacrity, we weren’t aware that every two of these hitches was a clove hitch. Nor would we have cared. It was just fun to see how fast we could get. VIEW VIDEO: Hitching Race

When preceding from the left, all that needs to be done is:

  1. Form a right underhand loop and place it over the pole.
  2. Form another right underhand loop and place it over the pole (on top of the pervious one).
  3. Voila! Clove hitch!

When preceding from the right, instead of right underhand loops, form left underhand loops.

In no position to tie anything but an
In no position to tie anything but an “Open-Ended Clove Hitch!”

Without being informed, one can just look at two of these half hitches and see they look exactly like a clove hitch. Of course, that’s because these two half hitches are a clove hitch. Throwing two half hitches over the open end of a vertical pole is the hands down, quickest way of tying a clove hitch. After you’ve done it for awhile, it takes about a second. A common way to refer to this “Clove Hitch on a Bight” is to call it an “Open-Ended Clove Hitch.” It’s exactly what the doctor ordered when you need to tie a clove hitch over the end of a spar. It’s also the only way to tie a clove hitch in the middle of a long line, like when securing a hand rope on the top of an A-frame during the construction of a Double A-frame Monkey Bridge (unless you want to pull foot after foot of rope through the hitches because you’re using an alternate method, or… you just don’t know any better).

Open-Ended Clove Hitch
Open-End Clove Hitch

It’s really surprising how many folks, old and young, aren’t familiar with this simple method of tying a clove hitch. Here’s an amusing illustration: A young Scout was competing at a camporee for the best time in completing a Rope-Toss-Log-Lift Challenge. After throwing the rope over the crossbar and tying the end to a log with a timber hitch, the third step is to secure the other end of the rope to a stake in the ground with a clove hitch. Ah! An open ended pole! So, this young Scout completes the first two steps, runs over to the stake and, bam! He ties an Open-Ended Clove Hitch over that stake in nothing flat. The jaw of the Scouter conducting the event drops down. With mouth open and a look of bewilderment on his face, he leans down, scratches his head, and examines the knot. Yes, to his surprise, indeed it’s a clove hitch! This skinny, young Scout did something the adult had never seen before, and the old guy was astonished!

Finishing a Lashing with Two Half Hitches. 

Finishing a Diagonal Lashing with Two Half Hitches forming the Clove Hitch
Finishing a Diagonal Lashing with Two Half Hitches forming the Clove Hitch

Here’s the story:  When you learn how to do this, number one, it’s faster. Number two, it’s also easier to securely finish off the frapping turns, because it’s a cinch to snug both half hitches in close and pull them real tight, which is definitely something you want to do.

1/2 HITCH + 1/2 HITCH = CLOVE HITCH  —> WATCH AND SEE!

Introduction to Pioneering

Link to: Older Pamphlet Info.The following text is by Adolph E. Peschke as presented in the 1998 printing of the 1993 edition of the Pioneering Merit Badge Pamphlet:

Pioneering is the knowledge and skill of using simple materials to build structures that are used in a wide range of Scouting activities. These skills are sometimes referred to as “backwoods engineering.”

Down through the ages, people have used ropes, spars, and simple hardware to build bridges, towers, and even their own shelters. In the early development of our country, pioneering methods were used in mining and transportation, to clear the wilderness, and to build roads and bridges. So it is understandable that the term “backwoods engineering” was applied.

The same skills can be used by Scouts to build pioneering projects ranging in complexity from a simple camp gadget to a signal tower.

Whatever the project, the same applied principles of physics, geometry, and math are used to build pioneering projects and structures. But, keep in mind that all the information (in this pamphlet*) is eventually used for a practical, hands-on application—that is, to build something.

Pioneering is a good foundation for many Scouting activities. You must learn, and then use, such disciplines as planning ahead and teamwork. You can also put to use the basic skills learned in rank advancement, such as knot tying.

But most of all, pioneering provides a practical way to experience the joy of accomplishment when you’ve built something that is needed for yourself or others; it can be something that makes living in camp easier and more comfortable. Pioneering can be both fun and challenging when you use your skill and knowledge to choose the right materials (ropes and spars) and build a usable structure.

The basics of pioneering, such as tying knots, making lashings, using rope tackle, constructing anchors, and basic rope knowledge can be done at home. The projects and structures (shown in this pamphlet**) can usually be constructed with materials available at summer camp or at council camping events.

* SAFE PIONEERING

* ROPE-TOSS-LOG-LIFT CHALLENGE

ROPE FOR PIONEERING AND CAMP USE

KNOT-TYING TERMINOLOGY

TIMBER HITCH

ROUNDTURN WITH TWO HALF HITCHES

ROLLING HITCH

BUTTERFLY KNOT

CARRICK BEND

CONSTRICTOR KNOT

WATER KNOT

PIPE HITCH

PRUSIK

SPLICING ROPE

* MAKING ROPE

WHIPPING

ANCHORING PIONEERING PROJECTS

ROPE TACKLE

LASHING

JAPANESE MARK II SQUARE LASHING

MAKING A TRESTLE

BRIDGE WALKWAYS

PIONEERING PROJECTS

** SINGLE TRESTLE BRIDGE

** SINGLE LOCK BRIDGE

** SINGLE A-FRAME BRIDGE

** 14′ DOUBLE LADDER SIGNAL TOWER

** DOUBLE A-FRAME MONKEY BRIDGE

PIONEERING KIT

 

Rope-Toss-Log-Lift Challenge

Racing over to the log!

If the site where you hold your meetings can feature a “permanent” crossbar about 10 feet high, then your Scouts can frequently practice and enjoy this activity whenever the opportunity is presented. Otherwise, erecting the crossbar is itself a mini-pioneering challenge, and if you have the grounds, can be regularly put up by a patrol  prior to or during as many meetings as desired.

Also referred to as the Rope-Throw-Log-Lift Game and the Heaving Bar, this is an activity requiring a series of rope-handling and knot-tying skills. Because the skills that are called into play aren’t normally combined in such a sequence, and because there’s an element of fast-paced, fun competition, those Scouts knowing how to tie the featured knots most often get a kick out of giving it a go. The activity can be a competition to complete the task in the fastest time between individual Scouts or played with a team of three Scouts, each assigned a specific task.

Here’s how Adolph Peschke describes this activity in the 1993 edition of the Pioneering Merit Badge Pamphlet:

Long log! (Isn't that supposed to be a timber hitch?)
Long log! (Good Half Hitch, but is that a Timber Hitch?)

This game is intended to develop the knot tying skills of an individual Scout or of a team of three Scouts. It is important to know that the knots used (clove hitch, timber hitch, sheep shank) are each tied in a typical application for each knot. Additionally, you will develop the skills of coiling and throwing a rope.

To prepare for this challenge, you should practice tying the individual knots and coiling and throwing a rope. The challenge starts for a single Scout with the rope coiled ready to throw. The rope is thrown over the cross spar. If the throw misses the mark, the Scout recoils the rope and throws again. If the throw is good, he uses the end of the rope he is holding to tie a clove hitch on the stake next to where he’s standing.

Next he moves to the end of the rope that was thrown over the cross spar and uses it to tie a timber hitch  around a short length of log (about 4 inches in diameter and 4 feet long). Then he ties a half hitch around one end of the log (forming a Killick Hitch).

To complete the challenge, he moves to the part of the rope between the stake and the upright structure, and ties a sheep shank to shorten the rope enough to suspend the log above the ground.

This is how it should look!
This is how it should look!

When the challenge is played with a team of three Scouts, the first Scout throws the rope over the cross spar and ties the clove hitch on the stake. the second Scout moves to the log and ties the timber hitch with the additional half hitch. The third Scout ties a sheep shank to shorten the rope and hold the log off the ground. The challenge comes when the game is played while being timed with a stopwatch. As a patrol, the times of the individual Scouts can be added up for a total patrol score.

Three Scouts at once!
Three Scouts at once!

The following materials will be needed so that three Scouts or three teams of Scouts can play simultaneously:

  • three 50-foot x 1/4 or 3/8-inch throwing ropes
  • two 8 to 10-foot x 2 to 3-inch legs
  • one 10-foot x 2 to 3-inch crossbar
  • two 15-foot x 1/4-inch lashing ropes
  • seven stakes
  • three 4-foot x 4-inch logs
  • four 20-foot guylines

To set up the upright structure, lash the cross bar to the legs with tight square lashings. About 3/4 of the way up each crossbar, attach two guylines with a roundturn with two half hitches. Stand up the structure where it will be positioned, and hammer the stakes about 12 feet out from the legs at 45° angles. So that good tension can be applied to each leg, you can attach the guylines to the stakes with a simple rope tackle.

On the throwing side, space out three stakes between the legs and hammer them in to the ground about 25 feet from the structure. On the other side space out the three logs.

SCOUT MEETING CHALLENGES MAIN PAGE

Rope-Toss-Log-Lift Challenge at the Jamboree